Malcolm ZoppiFri Feb 02 2024

Understanding the Concept: What is a Part 36 Offer?

A Part 36 offer is a form of offer to settle disputes that is governed by the civil procedure rules in the United Kingdom. It is a formal written offer made by either the claimant or the defendant, with the aim of settling all or part of a dispute before trial. Part 36 offers to […]

What is a Part 36 offer?

A Part 36 offer is a form of offer to settle disputes that is governed by the civil procedure rules in the United Kingdom. It is a formal written offer made by either the claimant or the defendant, with the aim of settling all or part of a dispute before trial.

Part 36 offers to settle are subject to specific requirements and rules, which must be followed in order to ensure their validity and effectiveness. Failure to comply with these rules can result in serious costs consequences for the parties involved.

The purpose of Part 36 offers is to encourage parties to settle their disputes without the need for a trial, thereby saving time and costs for all involved. They are often used in personal injury claims, but can be made in any type of claim.

This section will provide a detailed introduction to the concept of a Part 36 offer and its significance within the civil procedure rules in the United Kingdom.

Key Takeaways

  • A Part 36 offer is a form of offer to settle disputes in the United Kingdom
  • It is governed by the civil procedure rules and subject to specific requirements and rules
  • Parties can potentially save time and costs by settling their disputes through a Part 36 offer

What is a Part 36 Offer and How is it Used to Settle Disputes?

A Part 36 offer is a formal offer to settle all or part of a dispute made in accordance with Part 36 of the Civil Procedure Rules in the United Kingdom. A defendant may make a Part 36 offer to the claimant, or a claimant may make an offer to settle to the defendant. The offer must be in writing, and it must specify the terms that are being offered for settlement.

Part 36 offers are a useful tool for settling disputes, as they provide a way for the parties to resolve their differences without the need for a trial. If an offer is accepted, the settlement is binding, and the parties are required to comply with its terms. If an offer is not accepted, then the case may proceed to trial, and the costs consequences can be severe.

Costs Consequences of Making or Accepting a Part 36 Offer

One of the key features of a Part 36 offer is the potential costs consequences associated with it. If a claimant makes an offer to settle, and the defendant accepts it within the relevant period, the defendant will be liable for the claimant’s costs up to the date of acceptance, as well as any interest on those costs. If a defendant makes an offer to settle, and the claimant accepts it within the relevant period, the defendant will be liable for the claimant’s costs up to the date of acceptance, as well as any interest on those costs.

If an offer is not accepted, and the case proceeds to trial, the court will take into account any Part 36 offer that was made when deciding who should pay the costs of the proceedings. If the claimant is successful at trial and has made an offer that is more advantageous than the judgment that is ultimately obtained, the claimant may be entitled to additional costs and interest on those costs. If the defendant is successful at trial and has made an offer that is less advantageous than the judgment that is ultimately obtained, the claimant may be liable for the defendant’s costs from the date the offer was made.

Withdrawal or Variation of a Part 36 Offer

A Part 36 offer can be withdrawn or varied by the party that made it, but this must be done in accordance with the rules. If an offer is withdrawn or varied, the other party must be informed in writing. If an offer is withdrawn, the normal cost consequences will apply, unless the court orders otherwise. If an offer is varied, the time for acceptance starts running from the date of the variation.

It is important to note that a Part 36 offer cannot be withdrawn or varied once the relevant period for acceptance has expired. If an offer has been made, and the relevant period has expired, the offeror cannot change the terms of the offer or withdraw it without the other party’s consent.

In summary, a Part 36 offer is a powerful tool for settling disputes in the United Kingdom. It provides a clear framework for making offers to settle, and it also offers potential cost benefits for the parties involved. However, it is important to take legal advice before making or accepting a Part 36 offer, as the costs consequences can be significant.

Acceptance and Withdrawal/Variation of a Part 36 Offer

Once a Part 36 offer has been made, the offeror must await the offeree’s response. The offeree may choose to accept, reject, withdraw, or vary the offer.

If the offeree accepts the Part 36 offer, the acceptance must be in writing and received within the relevant period (usually 21 days). Upon acceptance, the offeree agrees to be bound by the terms of the offer. However, acceptance of a Part 36 offer may also trigger costs consequences which will be explored in Section 5.

If the offeree rejects the Part 36 offer, there is no further action required, and the parties can proceed with the litigation process as usual.

If the offeror chooses to withdraw or vary the original offer, it must be done in writing and received by the offeree. It is important to note that withdrawing or varying the Part 36 offer will have costs consequences for the offeror, especially if the offeree has already made attempts to settle the dispute.

Furthermore, if the offeree makes a counter offer, or proposes alternative terms, this will be considered a rejection of the original Part 36 offer and the offeror may be liable for costs that arise from the day after the expiry of the relevant period, unless the offeree subsequently accepts the original offer.

In summary, once a Part 36 offer has been made, the offeree has several options available to them, including accepting, rejecting, withdrawing, or varying the original offer. It is important that the offeror and offeree understand the implications and potential costs consequences of each option before making any decisions.

What Does Acceptance of a Part 36 Offer Mean?

Accepting a Part 36 offer within the relevant period can have significant legal and financial implications for both parties. Firstly, it means that the offeree accepts the offer to settle all or part of the dispute as set out in the offer. This means that the offeror will be bound to the terms of the offer and cannot unilaterally withdraw or vary it. On the other hand, if the offer is not accepted within the relevant period, it will be deemed as rejected, and the offeror will not be bound by the terms of the offer.

The relevant period is usually 21 days from the date of service of the offer, or longer if agreed by the parties. It is essential to note that the relevant period includes weekends, bank holidays, and any other days when the court is closed.

If the offer is accepted within the relevant period, it can result in significant costs consequences. The offeror will be liable to pay the offeree’s costs up to the date of acceptance, unless the parties agree otherwise. If the offer only relates to part of the claim, the costs consequences will be limited to the part of the claim covered by the offer. If the offer is accepted outside the relevant period, the costs consequences will depend on the circumstances and the court’s discretion. In the UK, ‘fitness for purpose’ obligations are often explicitly stated in construction contracts.

Comprehensive provider

Get the specialist support you need

Whether you require specialised knowledge for your business or personal affairs, Gaffney Zoppi can support you.

This section will delve into how these terms are defined and enforced in the UK legal context. For comprehensive legal assistance consider consulting with professionals specializing in construction contracts.

The Expiry of the Relevant Period

It is crucial to act promptly and take any necessary steps to accept or reject the offer before the expiry of the relevant period. If the relevant period expires without acceptance or rejection, the offer is deemed as rejected. In such cases, the parties may continue with the litigation or try to settle the dispute through other means.

Accepting the Offer in Whole or Part

It is possible to accept a Part 36 offer in part, which means accepting only a portion of the proposed settlement offer. The offeror will still be bound by the terms of the accepted offer, and the parties will need to determine the next steps for the remaining part of the dispute. Alternatively, a counteroffer can be made with different terms and conditions.

In summary, accepting a Part 36 offer within the relevant period means the offeree accepts the offer’s terms, and the offeror will be bound by them. It also has significant costs consequences that the parties need to consider carefully. If the offer is not accepted within the relevant period, it will be deemed rejected, and the parties can continue with litigation or explore other means of settlement.

Liability for Costs in Relation to a Part 36 Offer

When a Part 36 offer is made in accordance with the relevant Civil Procedure Rules, there are potential costs consequences that parties should be aware of. The liability for costs will depend on whether an offer is accepted within the specified time frame and whether it covers the whole or part of the claim.

If the offer is accepted within the relevant period, the offeror will be liable for the claimant’s costs up to the date of acceptance, unless the court orders otherwise. However, if the offer is not accepted within the relevant period and the claimant obtains a judgment that is at least as advantageous as the offer, the offeror will be liable for the claimant’s costs from the expiry of the relevant period to the date of acceptance of the offer.

It is important to note that a Part 36 offer may only be made in relation to the whole of a claim or to part of a claim that can be severed. If a party makes an offer to settle in whatever terms they choose, this will not have the costs consequences of a Part 36 offer.

If a defendant makes a Part 36 offer and it is not accepted within the relevant period, they may still be able to argue that the claimant should be liable for their costs. This will depend on whether the claimant acted unreasonably in rejecting the offer and how the case has progressed since the offer was made.

Overall, the costs consequences of a Part 36 offer can have a significant impact on the outcome of a case. Therefore, parties should carefully consider their options before making or accepting an offer to settle.

Withdrawing or Changing a Part 36 Offer

Once a Part 36 offer has been made, the offeror may choose to withdraw or change the offer under certain circumstances. However, the repercussions of withdrawing or changing the offer can be significant.

Firstly, if an offer is withdrawn by the offeror, the offeree may be entitled to claim for costs incurred up until the date of the withdrawal. In other words, the defendant will be liable for the claimant’s costs if the Part 36 offer is withdrawn.

Secondly, when a Part 36 offer has been made, the offer may be changed or varied by the offeror. However, it is important to note that from the date of variation, the original offer will no longer be effective. This means that if the offer is changed and the offeree fails to accept the new offer, the costs consequences of the original Part 36 offer may no longer apply. Therefore, it is crucial to carefully consider the implications of making any changes to a Part 36 offer.

If a Part 36 offer may no longer be suitable, another option may be to make a new offer. This can be particularly useful if the offeror wishes to settle the dispute on different terms to the original offer. However, it is important to remember that the costs consequences will be based on the most recent offer that was rejected, if applicable.

Example of the costs consequences of a withdrawn or changed offer

ScenarioOutcome
A Part 36 offer is made for £10,000 and is not acceptedThe defendant is ordered to pay the claimant’s costs up until the date on which the offer expired.
The Part 36 offer is withdrawn or changed by the offerorThe defendant will be liable for the claimant’s costs incurred from the date on which the offer expired to the date of withdrawal or change.
The claimant makes a new offer of £8,000, which is not acceptedIf the claimant obtains a judgment that is at least as advantageous as the original Part 36 offer, they will be entitled to their costs up until the date on which the original offer expired. However, as the offer was withdrawn, the claimant will have to bear their own costs incurred from the date of withdrawal to the date of the new offer.

Therefore, it is essential to seek legal advice before making any decisions about withdrawing or changing a Part 36 offer, to ensure that the potential costs consequences are fully understood.

The Terms and Conditions of a Part 36 Offer

When making a Part 36 offer, it is important to understand the terms and conditions that govern the offer and the obligations placed on the defendant within the specified time frame. According to the civil procedure rules, the defendant must pay the claimant’s costs within the period specified in the offer if the offer is accepted.

The offer must be in writing and state that it is intended to have the consequences of a Part 36 offer. The terms of the offer must also specify the period within which the defendant must pay the offer, which cannot be less than 21 days from the date on which the offer is made. If the defendant fails to make the payment within the specified time frame, they will be liable for the claimant’s costs incurred after the expiry of the relevant period.

If the offer is accepted within the specified time frame, the defendant is liable to pay the claimant’s costs up to the date of acceptance. This includes the claimant’s costs of the proceedings up to the date of acceptance, except where the offer provides for their costs to be assessed on a different basis.

The original offer may also contain additional terms and conditions that the defendant must comply with, such as an admission of liability or an agreement to settle all or part of the claim. The defendant may choose to accept the whole or part of the offer, or they may choose to make a counteroffer.

If the claimant’s offer is not accepted and the claimant later obtains a judgment that is at least as advantageous as the offer, then the claimant is entitled to their costs of the proceedings from the date of the offer. However, if the claimant’s offer is not accepted and they do not obtain a judgment that is at least as advantageous as the offer, then the claimant may be liable for the defendant’s costs incurred after the offer was made.

It is also important to note that the defendant may make an offer to settle under Part 36, and the same rules apply to the claimant as to the defendant. If the claimant accepts the defendant’s offer, then the defendant will be liable to pay the claimant’s costs up to the date of acceptance, and the claimant will be liable to pay the defendant’s costs incurred after the acceptance of the offer.

Subscribe to our newsletter

Please select all the ways you would like to hear from Gaffney Zoppi

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

Making an Offer to Settle: Claimant’s Part 36 Offer vs. Defendant’s Part 36 Offer

When it comes to making an offer to settle a dispute, there are two types of Part 36 offers: the claimant’s Part 36 offer and the defendant’s Part 36 offer. These offers differ in certain aspects, and it’s important to understand what sets them apart.

A claimant’s Part 36 offer is an offer made by the claimant to settle all or part of a claim against the defendant. The offer can be made at any time, but it must be made in accordance with the Part 36 rules. If the defendant accepts the offer within the relevant period, the defendant will be liable to pay the claimant’s costs up to the date of acceptance, as well as any agreed or court-assessed damages, unless the parties agree otherwise.

On the other hand, a defendant’s Part 36 offer is an offer made by the defendant to settle the whole or part of the claim against them. The offer can be made at any time, but it cannot be made before the expiry of 21 days from the date the claimant served the claim form on the defendant. Similar to the claimant’s offer, if the offer is accepted within the relevant period, the claimant will be entitled to their costs up to the date of acceptance, as well as any agreed or court-assessed damages, unless the parties agree otherwise.

It’s worth noting that a Part 36 offer cannot be accepted after the expiry of the relevant period, and it cannot be withdrawn or varied without the court’s permission once it has been made. If a party intends to make any changes to the offer, they must withdraw the original offer and make a new one.

When Can an Offer Not Be Accepted?

In some cases, a Part 36 offer cannot be accepted. For instance, if the offer has lapsed or has been withdrawn or varied, it cannot be accepted. Similarly, if the offer is less than 100% of the amount claimed, it cannot be accepted if the claimant has applied or intends to apply for summary judgment.

Moreover, if a defendant’s Part 36 offer is for a sum which, when taken together with any interest, is less than the claimant’s Part 36 offer, and the claimant has beaten their own offer, the claimant will be entitled to an additional amount on top of their costs and damages. This is called the Part 36 uplift, and it is a percentage of the damages awarded, up to a maximum of £75,000.

Thus, it’s crucial to understand the differences between a claimant’s Part 36 offer and a defendant’s Part 36 offer, as well as the circumstances under which an offer can or cannot be accepted. By doing so, parties can make informed decisions on whether to accept or make a Part 36 offer, and ensure they are aware of the potential costs consequences associated with doing so.

Liability for Costs in Relation to a Part 36 Offer

When a Part 36 offer is accepted within the specified time frame, the defendant will be liable for the claimant’s costs up to the date of acceptance, and these will be assessed on an indemnity basis. This means that the defendant will be required to pay the entirety of the claimant’s costs, rather than only a proportion of them.

If the claim has not been resolved completely, it is likely that further costs will be incurred. In these cases, the court will usually order that the defendant pays the claimant’s costs on an interim basis until the proceedings are concluded. The court will assess these costs on a standard basis, which takes into account factors such as the nature and complexity of the case.

If an offer is not accepted within the relevant period, the costs consequences of Part 36 may still apply. If the offer is not accepted and the claimant later obtains a judgment that is more advantageous than the offer, they will be entitled to their costs from the date on which the relevant period expired. The claimant will also be entitled to interest on these costs.

However, if the offer is not accepted and the claimant fails to obtain a more advantageous judgment, they will be liable for the defendant’s costs from the date on which the relevant period expired. Again, this will be assessed on a standard basis.

The relevant period within which the defendant must accept a Part 36 offer is 21 days. However, if the offer is made less than 21 days before trial, the period is extended to the date of the trial. It’s important to note that the offer must be made in accordance with Part 36 of the Civil Procedure Rules and must be in writing, clearly specifying whether it relates to the whole or part of the claim.

Overall, it’s clear that accepting a Part 36 offer can have significant costs implications for all parties involved. If you are unsure about whether to accept or reject an offer, it’s important to seek legal advice to ensure you understand the potential consequences of your decision.

Table: Costs consequences of accepting or rejecting a Part 36 offer

ScenarioOffer accepted within relevant periodOffer not accepted, claimant gets judgment more advantageous than offerOffer not accepted, claimant gets judgment less advantageous than offer
Costs consequencesDefendant liable for claimant’s costs up to date of acceptance, assessed on an indemnity basisClaimant entitled to costs from date of expiry of relevant period, assessed on a standard basisClaimant liable for defendant’s costs from date of expiry of relevant period, assessed on a standard basis

How to Make a Part 36 Offer

When it comes to making a Part 36 offer, there are certain requirements and steps that need to be followed in order to ensure that the offer is valid and has the desired legal and costs consequences. If you are considering making a Part 36 offer, here are the key factors to keep in mind:

  1. The offer must be in writing: A Part 36 offer must be made in writing and should clearly state that it is intended to have the costs consequences set out in the civil procedure rules.
  2. Offer to settle in whatever form: A Part 36 offer can be made to settle all or part of a claim, and can take various forms, including an offer to accept a sum of money, a proposal for a specific outcome, or an offer to pay the claimant’s costs.
  3. Offer to accept a sum: If the Part 36 offer is an offer to accept a sum of money, it should specify the amount offered and any conditions attached to the offer.
  4. Part 36 offer has been made: The offer should clearly state that it is intended to have the costs consequences set out in Part 36 of the Civil Procedure Rules.
  5. Costs consequences of Part 36: The offeror should also be aware of the potential costs consequences of making a Part 36 offer, including the risk of being liable for the defendant’s costs if the offer is not accepted and the claimant fails to obtain a better result at trial.

It is important to ensure that the Part 36 offer complies with the requirements set out in the civil procedure rules and is made within the relevant time frame. If the offer is accepted within the specified time frame, the parties can avoid the significant costs and uncertainties of a trial.

Conclusion

In conclusion, it is important to note that a Part 36 offer must be made in writing and comply with the rules set out in the civil procedure rules in the United Kingdom. The costs of the proceedings and the liability for costs must be agreed upon when making an offer, and the party making an offer should be aware of the potential costs consequences associated with the offer.

Accepting a Part 36 offer within the specified time frame can result in a favorable outcome for both parties, as the offeror may be liable for the claimant’s costs. Additionally, withdrawing or varying a Part 36 offer may result in costs being incurred by the offeror, as the defendant will be liable for costs if an offer has been made and subsequently withdrawn.

Overall, understanding the concept of a Part 36 offer and following the relevant procedures and rules can lead to a successful settlement of a dispute. It is crucial to seek legal advice and guidance when making or accepting a Part 36 offer to ensure all parties involved are aware of their rights and obligations.

FAQ

What is a Part 36 Offer?

A Part 36 offer is a formal offer to settle all or part of a dispute, made in accordance with the civil procedure rules in the United Kingdom.

How is a Part 36 Offer used to settle disputes?

Parties involved in legal proceedings can make a Part 36 offer to the other party, outlining the terms of settlement they are willing to accept. If the offer is not accepted and the case proceeds to court, there may be costs consequences associated with the offer.

How can a Part 36 Offer be accepted?

To accept a Part 36 offer, the offeror must communicate their acceptance in writing within a specified time frame. The offeror also has the option to withdraw or vary the offer before it is accepted.

What happens when a Part 36 Offer is accepted?

When a Part 36 offer is accepted within the relevant time frame, it has legal implications. The offeror becomes liable for costs up to the date of acceptance, and there may be other consequences depending on the terms of the offer.

Who is liable for costs in relation to a Part 36 Offer?

The party who makes the offer will generally be liable for the claimant’s costs if the offer is accepted within the specified time frame. However, if the offer is not accepted and the offeree achieves a judgment that is more advantageous than the offer, the offeree may have to pay the offeror’s costs from the date when the offer expired.

Can a Part 36 Offer be withdrawn or changed?

Yes, the offeror has the option to withdraw or change a Part 36 offer before it is accepted. However, there may be costs consequences associated with such actions, particularly if the offer is withdrawn after the relevant period has expired.

What are the terms and conditions of a Part 36 Offer?

The terms of a Part 36 offer will vary depending on the specific circumstances of the case. However, there are certain standard obligations imposed on the defendant if they accept the offer within the specified time frame.

What is the difference between a claimant’s Part 36 Offer and a defendant’s Part 36 Offer?

A claimant’s Part 36 offer is made by the party bringing the claim, outlining the terms they are willing to accept as a settlement. A defendant’s Part 36 offer is made by the party defending the claim, offering a sum of money or other terms to settle the case. Both types of offers have specific rules and consequences.

What are the costs consequences of a Part 36 Offer?

If a Part 36 offer is accepted within the relevant time frame, the party who made the offer will generally be entitled to their costs up to the date of acceptance. If the offer is not accepted and the offeree fails to achieve a more advantageous outcome in court, the offeree may be responsible for the offeror’s costs from the date when the offer expired.

How can a Part 36 Offer be made?

A Part 36 offer must be made in writing and clearly state that it is intended to have the consequences of a Part 36 offer. It should also specify the period within which the offer will remain open for acceptance and any relevant terms or conditions.

What should parties consider when making a Part 36 Offer?

Parties should carefully consider the potential costs consequences of a Part 36 offer and seek legal advice if necessary. They should also ensure that the offer is clear, unambiguous, and complies with the requirements set out in the civil procedure rules.

Find out more!

If you want to read more in this subject area, you might find some of our other blogs interesting:

Disclaimer: This document has been prepared for informational purposes only and should not be construed as legal or financial advice. You should always seek independent professional advice and not rely on the content of this document as every individual circumstance is unique. Additionally, this document is not intended to prejudge the legal, financial or tax position of any person.

Comprehensive provider

Get the specialist support you need

Whether you require specialised knowledge for your business or personal affairs, Gaffney Zoppi can support you.